BAYAH Phase II 2X15 MW WHR Project

PT Cemindo Gemilang Tbk is a premium cement manufacturer from Indonesia, and produces a top quality cement through our professional workforce and modern factories. BAYAH Phase II 2X15 MW project adopts waste heat recovery (WHR) system for power generation.

The WHR system in parallel with the power system will contribute extra short-circuit current to the system, thus the short-circuit level exceeds the permissible ratings of the system. Fault Current Limiter protects both WHR system and power system from short-circuit current damage. Two units of Fault Current Limiter (UFCL) are applied for this project, thereby ensuring a reliable power supply.

  • Year2019
  • CustomerPT Cemindo Gemilang
  • CountryIndonesia
  • IndustryCement
  • Websitewww.cemindo.com
  • Products AppliedCurrent Limiter