REPOWERING EB2 SIAM Project

The construction of the REPOWERING EB2 SIAM project is the power foundation guarantee for the continuous and stable operation of the second mine, and further enhances the scale of SX-EW process production at the mine, thereby maximizing the potential of Centinela’s huge mineral resource base.

The Fault Current Limiter (UFCL) is applied in bus-tie of 11kV system to support parallel operation of multiple bus sections and solve the problem of excessive short-circuit current in this case, ensuring reliable power supply.

  • Year2023
  • CustomerMinera Centinela
  • CountryChile
  • IndustryMining
  • Websiteweb.mineracentinela.cl
  • Products AppliedCurrent Limiter